Risk-Free B2B Procurement Framework
How To Order Custom Sportswear Directly From Our Factory
We have simplified custom apparel manufacturing into 4 predictable, transparent stages. From initial digital tech pack review to door-to-door express air delivery, you maintain full control of design, fit, and production timelines.
Choose Your Preferred Starting Point:
Track A: Tech Pack Ready
Already have vector artwork, CAD tech packs, or detailed garment specifications?
✓ Exact fabric GSM & trim matching
✓ Guaranteed factory-direct pricing
Track B: Brand Startup / Club
Launching an activewear label, gym merch drop, or sourcing uniforms for a sports team?
✓ CAD pattern drafting support
✓ Complete private label packaging
Track C: Physical Prototype
Want to physically touch, wear-test, and approve construction before ordering bulk?
✓ Dispatched in 7–10 business days
✓ Express DHL/FedEx air courier
The 4-Stage B2B Production Framework
Stage 1: Design Review & 24-Hour Itemized DDP Quote
Send your artwork, sketches, vector files (.AI, .PDF), or physical garment photos along with your quantity requirements. Our apparel engineering team evaluates pattern geometry, fabric substrate requirements, and trim specifications. Within 24 hours, you receive an itemized commercial proposal with fixed unit costs, prototyping timeline, and door-to-door Delivered Duty Paid (DDP) freight.
Stage 2: Physical Pre-Production Prototyping (7–10 Days SLA)
To guarantee absolute fit and quality alignment, we build a complete physical prototype prior to bulk production. For a flat $45 to $195 USD non-creditable engineering fee, our master patternmakers draft computerized CAD patterns, dye-sublimate or embroider custom artwork, and manually assemble your sample garment. Your prototype is dispatched via express international air courier (DHL/FedEx) in 7 to 10 business days.
Stage 3: Agile Bulk Production & 4-Stage AQL 2.5 Quality Assurance (14–18 Days)
Upon your physical prototype sign-off, bulk production commences. Our production cells operate high-gauge circular knitting machines, automated computerized laser cutters, and multi-needle flatlock sewing stations. In-line floor supervisors audit seam tension and dimensions every 30 minutes. Finished items undergo 100% measurement verification (±0.5cm tolerance) and conveyor metal detection to eliminate needle fragments.
Stage 4: Tracked Door-to-Door Air DDP Logistics (3–5 Days Worldwide)
Finished garments are individually polybagged with custom size stickers, packed in heavy-duty double-wall master cartons, and dispatched from Sialkot International Airport (SKT). Under our Delivered Duty Paid (DDP) service, all export documentation, customs clearance, and local import duties are fully managed. Your consignment lands directly at your business facility or warehouse in 3 to 5 business days with real-time tracking.
🔒 Secure Commercial Payment Protocols
Sports Outlines transacts exclusively through regulated commercial banking channels to ensure complete legal and financial security for international brand owners:
- Corporate SWIFT MT103 Bank Wires: Direct bank-to-bank international transfers to our corporate account registered with the State Bank of Pakistan.
- Secure Online Card Invoicing: Direct payment processing via major debit and credit cards (Visa, MasterCard, American Express).
- Official Regulatory Compliance: Every export consignment is backed by a State Bank of Pakistan Form-E declaration and Sialkot Chamber of Commerce & Industry (SCCI) Certificate of Origin.
Connect Directly with Sialkot Factory Directors
Skip commercial trading brokers and speak directly with the engineers running the factory floor.